634
|
1
|
|
2 Deco Engine Calculation Schedules:
|
|
3 ==================================
|
|
4
|
|
5 Schedule Dive Mode Bailout fTTS Gas Needs Plan Deco Mode Planning Modes
|
|
6 -----------------------------------------------------------------------------------------------
|
|
7
|
|
8 1a) OC no no (yes) norm OC (gas needs)
|
|
9 alt -- --
|
|
10
|
|
11 1b) OC no YES (yes) norm OC --
|
|
12 alt OC fTTS, (gas needs)
|
|
13
|
|
14 2a) Loop no no no norm Loop --
|
|
15 alt -- --
|
|
16
|
|
17 2b) Loop no yes no norm Loop --
|
|
18 alt Loop fTTS
|
|
19
|
|
20 2c) Loop no (yes) YES norm Loop --
|
|
21 alt OC gas needs, (fTTS)
|
|
22
|
|
23 3) Loop YES n/a (yes) norm OC bailout, (gas needs)
|
|
24 alt -- --
|
|
25 _______________________________________________________________________________________________
|
|
26 norm: normal plan, alt: alternative plan, -- none, (): optional, n/a: not applicable |